PELLET BOILER SET WITH BURNER PP + HOPPER  40kw Biomass

PELLET BOILER SET WITH BURNER PP + HOPPER 40kw Biomass

000812322000104

Colour: red/black
Condition: New
Price: £ 4900.00
Shipping Cost: £ 100.00

Pellet burning Boiler 40kW  £4900 + vat 

The mantel fully covers the combustion chamber fuel hopper included. Efficienncy rate reaching 94% ,Available sizes 12kw, 23kw, 40kw.

Product features


Fully automated operation, hi- tech design

Two fans assist the combustion process.

Automatic self cleaning mechanism.

Fuel Hopper with alternative mounting on the left or right side of the boiler  approx 500kg  pellet load size.

Convenient door, Ash Tray

Exhaust gas sensor

CPU Controller with LED Display for precise setting of the combustion rate.

Safety device:

1./ The CPU controller alerts in case of abnormal temperature rise.

2./ STB thermostat reacts to increased operating and shuts down the fan.

Technical Specifications:

Model 40kW

Heat out put = 40kW

volume of combustion chamber L = 53

Dimensions of Load opening mm = 490 x 260

Operating Pressure bar = 2.5

Overall weight = 220 kg

Height A = 1480mm, x Width B = 665mm, x Depth C = 660mm

Flue D, = 0/ 135mm

Hot water outlet E = 3/4 (22mm)

Cold Water inlet G = 1/2 (15mm)

Drain mm = R 3/4 (22mm)

Insulation , Rock wool and foil

Electric consumption W = 500w

Temperture of Flue c <100

Water mantel volume: L = 70

Electric power supply 230v/ 50hz

Operating temp range : 65-90 degrees celsus

Burner: pp Power efficiency kW % 5/20 >91 , PD Power efficiency 6/23 >92-94

These systems hold the following certification and are currently being tested by the BBA, This system will qualify for Govemrment grant scheme.

Produced in compliance with EN303-5

Trade discounts are available please email us prior to order!

 

BBA Cert and MCS approval

The Renewable Heat Incentive is the compliment to the Feed In Tariff (FIT) which is for electricity generation. The RHI supports various forms of heat generation including biomass boilers and solar thermal hot water. Currently The RHI is being launched in 2 main Phases. Phase 1 is for non-domestic installations and for communities. As long as the technology used is MCS certified, and the installers are MCS registered, then the installation should be eligible for the grant scheme - provided the other criteria are met.

 

back to main page

Term & Conditions    Privacy policy    Returns    Delivery    Web Designer    © WoodmanStore.com, 2014